LAYING THE SLABS Now it's time to start laying paving slabs on your concrete. Keep adding the slabs and ensure there's a gap of about 8 to 10mm between each stone. Don't walk on the slabs once they're laidyou need to wait for the concrete to set, which should take around 24 hours.

In respect to this, can you lay patio slabs on top of an old patio?

Any type of paver is appropriate for use when covering up an old patio, as long as the stones fit together and create a tight surface. This includes flagstone, brick or natural paver stones; however, if you plan to use mortar, bricks should not be used if the existing surface is asphalt.

Furthermore, can you tile over paving slabs? When tiling a floor the surface needs to be secure and firm. Only way to do it right would be to pull up the pavers and lay a slab then tile. As above – the issue is not the weight, it is that the pavers will move about, causing the tiles to either crack or come loose (even if you use a flexible tile adhesive).

Just so, what should I lay slabs on?

Lay the paving slabs on a full mortar bed, which should support the whole slab, not just the corners. Use a mortar mix of 6 parts sharp sand to 1 part cement. Mix together with just enough water to make it damp and workable, but not overly wet and runny.

Can you lay paving slabs without cement?

Although building your patio over a concrete slab helps to ensure it won't settle unevenly later, you can build a patio without cement. By laying flagstone, tile, brick or other sturdy, flat pavers on a well-prepared base, your patio will be less expensive and more water-permeable.

How do you take up old patio slabs?

Use the sledge hammer near the pry bar tip to break off more of the concrete. Remove rubble, and continue these steps, with the pry bar tip moving with the removable concrete slab edge. Progress at this point will feel slow, but stick with it. Keep removing the rubble, and using the pry bar and sledge hammer in tandem.

Can you lay a patio yourself?

Can I do it myself, and if so how? DIY guru, Jo Behari, says: A patio is relatively simple to lay and the materials are available at hardware stores. First, dig out any turf or plants down to about 10-15cm to form the foundations. Then put down a layer of 'hardcore', which is broken bits of rubble and brick.

Can I lay a patio on concrete?

According to several paver manufacturers, paving blocks can be installed on top of concrete without mortar if you first lay down a 1/2″ to 1” bed of coarse sand. The process is nearly identical to laying a paver patio over ground. Before you begin, make sure your concrete is properly sloped and doesn't puddle.

Can you lay slabs on sand only?

If you're not confident about making a concrete bed, don't worry – sharp sand is easier, and works just as well. Ensure the layer of sharp sand is packed down and levelled off, with a gradual slope away from your home to help drain off surface water. Laying slabs on sand. Now it's time for laying the patio on the sand.

What is the best way to lay patio slabs?

Here's how to lay a patio in 6 easy steps.
  • Dig 150mm into your patio area.
  • Lay a compacted sub-base of 100mm.
  • Cover the area with 40mm of concrete mix.
  • Lay paving slabs 15mm into the concrete with a 10-15mm gap.
  • Leave to set for at least 24 hours.
  • Fill the gaps between the paving slabs with concrete mix.
  • Can you lay pavers directly on dirt?

    A backyard patio and a casual brick walkway are two types of surfaces you can build with brick pavers. Laying bricks on dirt is not complicated. But there are several steps involved to ensure the bricks will not shift or sink into the dirt over time.

    How many slabs can I lay in a day?

    I can lay about 25 square metres of random lay rough cut slabs a day. Anything over 20 is a good speed. /Obviously it all depends on how accurate your base is and the quality of slabs.

    What is sharp sand for?

    Sharp sand, also known as grit sand or river sand and as builders' sand when medium or coarse grain, is a gritty sand used in concrete and potting soil mixes or to loosen clay soil as well as for building projects.

    How much sand and cement do I need to lay a slab?

    Paving slabs are bedded in a mortar mix with four parts sharp sand to one part cement. Measure your quantities using a shovel or a bucket - for example, four buckets of sand for every one bucket of cement.

    What sand do you use for pointing paving slabs?

    Pointing of all kinds should be carried out on a dry day and when your patio itself is dry. For joints which are less than ½ an inch (13mm) you should use silver sand. This is more commonly called playpit sand. The sand is mixed with cement at a ratio of 1 to 1 and spread out to dry thoroughly.

    How long does it take to lay a patio?

    two to three days

    How deep should a sub base be for a patio?

    Generally, a flexible sub-base of unbound material needs to be at least 100mm deep, as does a bound sub-base of CBM/HBM. For bitumen-bound material, then 50mm is a typical minimum thickness.

    How thick should paving slabs be?

    Dense and much thicker than domestic slabs, high-grade commercial paving slabs usually range between 50-70mm in thickness (domestic paving slabs are usually up to 40mm thick). This makes them suitable for occasional vehicle traffic such as road sweepers.

    Is paver base necessary?

    Do I Need to Lay Gravel Before Pavers? You have several ways to install pavers, including directly over dirt, in mortar or over a bed of gravel and sand. While you don't need to lay a gravel foundation for pavers, you should assess the condition of the base and make it as solid as possible before laying the pavers.

    How do you build a 12x12 paver patio?

    To install patio pavers, dig up the first 6 to 8 inches of soil. Then, lay down 4 to 6 inches of gravel in that hole and compact it using a plate compactor. Add a layer of fine sand over the gravel and compact it as well. Next, start at one corner of the project and lay the pavers down as close together as possible.

    How do I build a patio with uneven ground?

    How to Install Pavers on Unlevel Ground
  • Build walkways on unlevel ground by accommodating to the terrain.
  • Assess the terrain for a patio.
  • Level a patio on extreme terrain with retaining walls on one or two sides.
  • Excavate the paver area with a shovel or excavator.
  • Smooth the sand base by moving a 2-by-4-inch board across it.
  • How do you install 24x24 pavers?

    How to install 24″ concrete pavers
  • Step 1: Mark out the design.
  • Step 2: Level the ground.
  • Step 3: Cover the area with weed blocking fabric.
  • Step 4: Add a layer of aggregate and compress.
  • Step 5: Add a layer of sand and level.
  • Step 6: Lay pavers.
  • Step 7: Fill in cracks with sand.
  • Step 8: Fill in spaces with gravel.