What is a AIA document?
Publish date: 2022-11-27
AIA contracts and forms are consensus documents that reflect advice from practicing architects, contractors, engineers as well as owners, surety bond producers, insurers, and attorneys. AIA documents balance the interests of all the parties, so no one interest, including that of the architect, is unfairly represented.Also question is, how many AIA Document families are there?
nine families
Beside above, how do I get an AIA certification? The basics
Then, what are the contract documents?
On a traditionally-procured, fully-designed construction project, the contract documents for suppliers such as the main contractor are likely to include:
- Article of agreement and conditions of contract, for completing as a simple contract (or as a deed).
- Working drawings.
- Bills of quantities.
- Specifications.
What is an AIA Application for Payment?
An AIA is a document that contains completed contract billing throughout the project; this document was created mainly to assist architects working on a construction project to be paid for the work completed on the project.
What does AIA stand for in accounting?
Association of International AccountantsAre contract documents?
Contract Documents—Those items so designated in the Agreement, and which together comprise the Contract. Bidding Documents—The Bidding Requirements, the proposed Contract Documents, and all Addenda. Shop Drawings, whether approved or not, are not Drawings and are not Contract Documents.What is construction document?
Construction Documents means the detailed working drawings and project manual containing detailed specifications and other supporting documents as approved by the reviewing authority. Construction Documents means complete construction plans and specifications for the Leasehold Improvements.What is the architect registration exam?
The Architect Registration Examination® (ARE®) is a multi-division exam used to assess your knowledge and skills regarding the practice of architecture. The current version of the exam, ARE 5.0, is developed by NCARB and features six divisions.What is a schedule of values form in construction?
A Schedule of Values (SOV) is a detailed schedule apportioning the original contract sum and all change orders, among all cost code divisions or portions of the work. After the Schedule of Values is approved, it becomes the basis for all Contractor/Vendor invoices for hard and soft costs."What is a final document?
: a final version of something (such as a document) usually after a lot of editing and rewriting The final draft is due tomorrow.What is a g703 form?
AIA Document G703–1992 breaks the contract sum into portions of the work in accordance with a schedule of values prepared by the contractor as required by the general conditions. NOTE: The AIA does not publish a standard schedule of values form.What is application for payment?
An application for payment is a construction document that outlines how a contractor will be paid. An application for payment provides both the owner and the contractor with a method of controlling what items or materials have been provided by the contractor.What is a AIA g702 form?
The AIA® contractor form G702 Application and Certificate for Payment is the form that the contractor uses to invoice on the project when AIA® forms are required. The AIA® Document G702–1992 is both the contractor's request for payment as well as the architect's certification (determining whether or not you get paid).What does materials presently stored mean?
Stored materials present a potentially serious point of tension between lenders and borrowers in the negotiation of a construction loan agreement. In construction lending, the term “stored materials” refers to the materials and items that are purchased in advance of their use and incorporation into the project.ncG1vNJzZmiemaOxorrYmqWsr5Wne6S7zGiuoZmkYra0ecBmmKKZXZm8pMHMnqWt